Wells & water/ CALCULATOR

Well-pump cycle-rate screening

Estimate one pressure-tank draw-and-refill cycle under a steady water demand below pump capacity.

Use published or measured drawdown between the actual cut-out and cut-in settings.
Use flow at the system operating head, not an unrestricted maximum-flow label.
This model requires demand to remain below pump delivery.
Pump-off draw time

1.50 min

Pump-on refill time

1.50 min

Complete cycle time

3.00 min

Estimated starts per hour

20.0 starts/h

Pump run time per hour

30.0 min/h

Constant demand, constant pump delivery, full usable drawdown each cycle and no variable-speed control. Real fixtures vary, switch and tank behavior have tolerances, and pump manufacturers set allowable starts and minimum run time. Treat the result as a diagnostic screen, not a control setting.

Continue your calculation